Anniversary Park Redesign

The City of Toronto has contracted Thinc Design, a Toronto-based landscape architecture firm to redesign and rename Anniversary Park in an effort to improve and update the vision of the park for neighbours, community members and visitors to enjoy.

Currently, the Anniversary Park Slip Lane design facing west has no parking, narrow sidewalks, 9.2m wide vehicle roadways and has no dedicated cycling lanes or facilities. The proposed opportunities to redesign the park offers the Cabbagetown South neighborhood options to reduce vehicle speeds, create shared spaces, narrow roadways for shared travel options, and additional green infrastructures

This park is currently in the process of being named!

Leave your mark, Name your park!

  • Integration of Anniversary Park into Gerrard Complete Street and Cabbagetown Cycling Network
  • Unit paving to be carried through streetscape and park
  • Anniversary Park design to incorporate and meet new Western crossing
  • Anniversary Park design to continue to meet with Eastern sidewalk
  • Anniversary Park to mirror planting buffer on the South side of Gerrard
  • Bench and Bollard location on north side

This is the information city staff recorded during community engagement workshops.

Stay tuned for upcoming surveys and public engagement events!

Phases

Phases overview
Phase 1: Background and Field Analysis
Background and Field Analysis
Phase 2: Community Engagement
Community Engagement
Phase 3: Detailed Design Development
Detailed Design Development
Phase 4: Construction Contact
Construction Contact
Phase 5: Gerrard Street East Reconstruction
Gerrard Street East Reconstruction
Phase 6: Construction of Anniversary Park
Construction of Anniversary Park

Community Engagement

April 1, 2023 4:00 AM - August 2, 2023 4:00 AM

During this phase of the community engagement process, the City and its design consultant will work off the outcomes of Phase 1 to develop two to three design options (called concept options) for the park improvements. These will be presented to the community for feedback, with the input collected used to develop a preferred design for the park.


Please review the community stakeholder workshop phase 2 (July 6, 2023):

If you were unable to make it, please review the attached Idea board to view feedback.

0 ideas

No results found. Please try a different filter or search term.

Filters

Total posts: 0

Sorting changed to: Trending

No values available.

Selected zero tag filters.

Upcoming and ongoing events

    0 events have loaded.
    No upcoming or ongoing events are currently scheduled.

    Past events

    2 events have loaded.