Skip to main content

Traffic Control Signals- Mutual St and Dundas St East

As part of Vision Zero, priorities are to protect and enhance the safety of vulnerable road users, especially school children and those with accessible needs.

The installation of traffic control signals at the intersection of Mutual Street and Dundas Street East would be estimated at $200,000, considered in the 2022 Capital funding.

Installation of traffic control signals at the intersection of Mutual Street and Dundas Street East was authorized and approved by Community Council to delegate authority from City Council to make a final decision.

Phases

Phases overview
Phase 1: Ideation and Analysis
Ideation and Analysis
Phase 2: Securing Construction Contract
Securing Construction Contract
Phase 3: Construction and Installing
Construction and Installing
Phase 4: Ribbon Cutting & Public Opening
Ribbon Cutting & Public Opening

Ideation and Analysis

October 28, 2018 4:00 AM - July 1, 2021 4:00 AM

The study was performed, starting on October 24, 2018 and ended in June of 2021. The study was conducted to record the total volume and delays of pedestrian crossing on Dundas Street East at Mutual Street. The study wanted to accommodate seniors, unassisted children, and people with disabilities that are observed at crossing--calculated to adjusted volume of pedestrians observed. The volume of pedestrian traffic and vehicular traffic were both recorded to be in the higher decimal percentages which required additional studies to be done to determine safety needs.